File:下淡水溪鐵橋(高屏溪舊鐵橋).jpg

原始文件(4,107 × 2,943像素,文件大小:3.27 MB,MIME类型:image/jpeg

摘要

描述
中文(臺灣):下淡水溪鐵橋(高屏溪舊鐵橋)興建於1911年(日明治44年)初,1913年(日大正2年)底竣工,於1914年正式啟用,至1992年除役,現為國定古蹟。 下淡水溪鐵橋(高屏溪舊鐵橋)全長1526公尺,堪稱是劃時代的重大工程,竣工通車後,以當時日本官方刊物的說法,是「東洋第一長橋,遠望有如彩虹一般,是南臺灣的一大偉觀」。
English: The Kaohsiun-Pingtung Old Bridge was built by the Japanese engineer Ilida Toyozi and completed in 1913. A single-track railway, it was the longest railway bridge in Asia at the time. A century later, it was revitalized and renovated by the Municipal Government in a line with the principle of "not losing any original components", producing the Old Railway Bridge Hanging Trail, and providing a viewing platform on which tourists could relax. As well as being able to appreciate the beauty of the old railway bridge, the jade-green wetlands of Gaoping River and the beautiful rivers and mountains, it displays a multi-layered, lively beauty when the sun is setting.
日期
来源 自己的作品
作者 WEI, WAN-CHEN(魏琬臻)
相机位置22° 39′ 38″ 北, 120° 26′ 08″ 东 Kartographer map based on OpenStreetMap.在以下服务上查看本图像和附近其他图像: OpenStreetMapinfo

许可协议

我,本作品著作权人,特此采用以下许可协议发表本作品:
w:zh:知识共享
署名 相同方式共享
本文件采用知识共享署名-相同方式共享 4.0 国际许可协议授权。
您可以自由地:
  • 共享 – 复制、发行并传播本作品
  • 修改 – 改编作品
惟须遵守下列条件:
  • 署名 – 您必须对作品进行署名,提供授权条款的链接,并说明是否对原始内容进行了更改。您可以用任何合理的方式来署名,但不得以任何方式表明许可人认可您或您的使用。
  • 相同方式共享 – 如果您再混合、转换或者基于本作品进行创作,您必须以与原先许可协议相同或相兼容的许可协议分发您贡献的作品。


说明

添加一行文字以描述该文件所表现的内容

此文件中描述的项目

描繪內容

22°39'38.002"N, 120°26'8.002"E

曝光时间 简体中文(已转写)

0.00043103448275862068

焦距 简体中文(已转写)

4.2 毫米

image/jpeg

文件历史

点击某个日期/时间查看对应时刻的文件。

日期/时间缩⁠略⁠图大小用户备注
当前2017年9月14日 (四) 16:372017年9月14日 (四) 16:37版本的缩略图4,107 × 2,943(3.27 MB)WEI, WAN-CHENUser created page with UploadWizard

以下页面使用本文件:

全域文件用途

以下其他wiki使用此文件:

元数据